The Purvanchal Expressway

S. No.SubjectUploaded DateView/Download

1

Monitoring details of Purvanchal Expressway Project by Project Monitoring Group.Size: 2.77MB | Language: English04-08-2021 
2Purvanchal Expressway Project MapSize: 256KB | Language: English21-01-2020 

Details of Purvanchal expressway project and updated status

Starting point: Village Chand Sarai, located at Lucknow-Sultanpur Road (NH-731), district Lucknow.

Ending Point: Near village Haidaria on National Highway No. 19, before 18 KM of the UP-Bihar border, in the district Ghazipur.  Total length 340.824 KM.

Project Cost – Rs. 22,494.66 crore (Including the cost of land).

Other districts falling on the expressway – 1. Lucknow, 2- Barabanki, 3- Amethi, 4- Sultanpur, 5-Ayodhya, 6- Ambedkar Nagar, 7-Azamgarh, 8-Mau, 9-Ghazipur

The project has been divided into 8 packages for implementation.

Contracts have been constituted with the developers of all packages with effect from October 2018. The project has to be completed in 36 months and the deadline is October 2021. The inauguration of this expressway has been completed on November 16, 2021 by Hon’ble Prime Minister at Kurebhar-Airstrip, district-Sultanpur.

As per executed agreements, the due date for COVID-19 completion is October 2021. However, in light of disruption in contract activities, the demand for EOI from EPC Contractor under GOI Atamnirbhar Guidelines is under consideration.

Introduction

For the development of the remotest eastern region, State Government has decided to develop another Expressway from State Capital (Lucknow) to the Eastern Region via Azamgarh. With the development of this Expressway, the Eastern region of the state would not only be connected to the state capital but also further to the National Capital. Through Agra-Lucknow & Yamuna Expressway

SALIENT FEATURES OF THE PROJECT

Starting PointChand Sarai (District Lucknow) near-road cross-section constructed along with NH-731.
End PointHaidaria (District Ghazipur)
Highlights
    • Estimated Total Length – 340.824 km
Mode of ImplementationThe Project is being implemented on Engineering, Procurement and Construction (EPC) Mode.

Package wise Project Reports

S. No.SubjectUploaded DateView/Download
 EPC-MAIN REPORT-PE-P1Size: 1.12MB | Language: English07-05-2018 
 EPC-MAIN REPORT-PE-P2Size: 1.20MB | Language: English07-05-2018 
 EPC-MAIN REPORT-PE-P3Size: 1.18MB | Language: English07-05-2018 
 EPC-MAIN REPORT-PE-P4Size: 1.21MB | Language: English07-05-2018 
 EPC-MAIN REPORT-PE-P5Size: 1.18MB | Language: English07-05-2018 
 EPC-MAIN REPORT-PE-P6Size: 1.16MB | Language: English07-05-2018 
 EPC-MAIN REPORT-PE-P7Size: 1.15MB | Language: English07-05-2018 
 EPC-MAIN REPORT-PE-P8Size: 1.13MB | Language: English07-05-2018 
 Traffic Toll & Financial Studies-PF -P9Size: 3.59MB | Language: English07-05-2018 

PROJECT BENEFITS

With the Construction of Purvanchal Expressway, accelerated convenient mode of Transportation shall be available between the Eastern boundary of the State and the National Capital via State capital through other similar Expressways in the State viz. ‘Agra to Lucknow Expressway’  and ‘Yamuna Expressway’

Being an Access Controlled Expressway, it would provide benefits like fuel-saving, time saving and Control in Pollution level, along with reduction in accidents.

The areas covered by this Expressway would be benefited in a Social & Economical way. Agriculture, commerce, tourism, and other industrial development will also get a fillip.

Industrial Training Institutes, Educational Institutes, Medical Institutes, New Townships and other various Commercial set ups shall be developed, especially near the Expressway areas, which will result into more opportunities for employment in the region. The overall social/economic development in the state will get a boost.

The proposed Expressway will prove to be a catalyst for the development of the region and State.

The proposed Purvanchal Expressway getting connected with existing Agra-Lucknow Expressway shall become a vast Industrial Corridor connecting Eastern boundary to Western boundary of the state which will result into overall development of the state.

S. No.SubjectUploaded DateView/Download
 Central Lines Coordinates (Packages I to VIII)
 Size: 290KB | Language: English
03-02-2018 
 KMZ File for Packages I
 Size: 7.9MB
19-02-2018 
 KMZ File for Packages II
 Size: 6.1MB
19-02-2018 
 KMZ File for Packages III
 Size: 6.5MB
19-02-2018 
 KMZ File for Packages IV
 Size: 6.5MB
19-02-2018 
 KMZ File for Packages V
 Size: 8.3MB
19-02-2018 
 KMZ File for Packages VI
 Size: 4.5MB
19-02-2018 
 KMZ File for Packages VII
 Size: 6.9MB
19-02-2018 
 KMZ File for Packages VIII
 Size: 11.4MB
19-02-2018 
S. No.SubjectUploaded DateView/Download
 Progress Report of Purvanchal Expressway
Size: 63.68KB | Language: English
15-11-2021 
 Status of Resumption of Work of Purvanchal Expressway Size:188KB | Language: English21-04-2020 
 Land Acquisition Details of Purvanchal Expressway Size:404.86KB | Language: Hindi17-06-2020 
 Land Acquisition Details of Purvanchal Expressway Size:20.66KB | Language: Hindi24-09-2019 
 Land Acquisition Details of Purvanchal Expressway Size:20.3 KB | Language: Hindi10-07-2018 
 Land Acquisition Details of Purvanchal Expressway Size:20.3 KB | Language: Hindi01-06-2018 
 Land Acquisition Details of Purvanchal Expressway Size:20.3 KB | Language: Hindi11-05-2018 
 Land Acquisition Details of Purvanchal Expressway Size:20.3 KB | Language: Hindi03-05-2018 
 Land Acquisition Details of Purvanchal Expressway Size:296 KB | Language: Hindi13-04-2018 
 Land Acquisition Details of Purvanchal Expressway Size:23 KB | Language: Hindi06-03-2018 
 Land Acquisition Details of Purvanchal Expressway Size:22.4 KB | Language: Hindi20-02-2018 
 Land Acquisition Details of Purvanchal Expressway Size:22.5 KB | Language: Hindi05-02-2018 
 Land Acquisition Details of Purvanchal Expressway Size:22.6 KB | Language: Hindi01-02-2018 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.5 KB | Language: Hindi16-01-2018 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.5 KB | Language: Hindi04-01-2018 
 Land Acquisition Details of Purvanchal ExpresswaySize:23.7 KB | Language: Hindi18-12-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.9 KB | Language: Hindi05-12-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.9 KB | Language: Hindi14-11-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.9 KB | Language: Hindi08-11-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.7 KB | Language: Hindi02-11-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.7 KB | Language: Hindi27-10-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.7 KB | Language: Hindi23-10-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.7 KB | Language: Hindi13-10-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.7 KB | Language: Hindi
09-10-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:47.9 KB | Language: Hindi
04-10-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:23.0 KB | Language: Hindi
25-09-2017 
 Land Acquisition Details of Purvanchal ExpresswaySize:22.9 KB | Language: Hindi
22-09-2017 
 Daily construction progress reportSize: 22.9 KB | Language: English24-05-2017 
 Daily construction progress reportSize: 47.9 KB | Language: English01-06-2017 
 Projected Progress Report for Agra-Lucknow Expressway May 2017Size: 23.0 KB | Language: English05-06-2017 
 Estimated Progress Report for Agra-Lucknow Expressway 01-06-2017 to 07-06-2017Size: 22.9 KB | Language: English08-06-2017